Data wysylki: 2025-01-18
WE WILL COMMISSION THE PRODUCTION OF THE DETAIL
We will commission the production of the detail. Drawing: link to the file . Ready-made from material 1.4301, alternatively please provide an offer for material C45. Expected completion date: 14-15 TK 2025. Please provide a price and deadline offer. STP file from your cyberbiznes consultant.
The term search: 7 dni
Correspondence in: polski
Similar offers
Shipping date: 2026-01-15
WE WILL COMMISSION THE MACHINING OF A STEEL DETAIL
Shipping date: 2026-01-14
I WILL COMMISSION LASER CUTTING AND BENDING OF STEEL SHEETS
Shipping date: 2026-01-13
I WILL COMMISSION THE CONSTRUCTION OF A STEEL HALL
Shipping date: 2026-01-12
I AM LOOKING TO COMMISSION THE PRODUCTION OF ALUMINUM STRUCTURES
Shipping date: 2026-01-10
I WILL COMMISSION THE PRODUCTION OF A PU ELEMENT AND A STEEL SOCKET
Shipping date: 2026-01-07
I WILL COMMISSION THE PRODUCTION OF DETAILS FROM A PIPE OF 159X36 MM, LENGTH 253 MM
Shipping date: 2026-01-07
I WILL COMMISSION GRINDING OF STAINLESS STEEL PIPES
Shipping date: 2026-01-06
I WILL COMMISSION THE PRODUCTION OF ALUMINUM PROFILES
Shipping date: 2025-12-23
STEEL ELEMENT FOR SECURING THE LATCH
Shipping date: 2025-12-18
I AM LOOKING FOR MACHINING OF PARTS FROM ALSI10MG AND PRODUCTION OF RINGS FROM P20 STEEL.
Shipping date: 2025-12-17
WE WILL COMMISSION THE CUTTING AND BENDING OF SHEET METAL
Shipping date: 2025-12-16
I WILL COMMISSION SHEET METAL BENDING
Shipping date: 2025-12-10
I WILL COMMISSION SHEET METAL BENDING AND CUTTING
Shipping date: 2025-12-10
I WILL COMMISSION THE PRODUCTION OF METAL CONTAINERS
Shipping date: 2025-12-09
I WILL COMMISSION THE PRODUCTION OF METAL PLATES
Shipping date: 2025-12-08
I WILL COMMISSION MILLING OF ELEMENTS
Shipping date: 2025-12-08
I WILL COMMISSION THE PRODUCTION OF AN ALUMINUM BLOCK
Shipping date: 2025-12-03
I WILL COMMISSION THE PRODUCTION OF AN ELEMENT MADE OF S235 STEEL
Shipping date: 2025-12-03
I WILL COMMISSION THE PRODUCTION OF FLOWER STANDS FROM ALUMINUM SHEET
Shipping date: 2025-11-29




