Data wysylki: 2026-03-02
STEEL ELEMENTS - FRAMES - AS IN THE ATTACHED DRAWINGS.
I am looking for: I will commission the production of frames as in the attached drawings: item 1 Fig. 301.26.01.00 - 1 piece item 2 Fig. 301.16.01.00 - 1 piece item 3 Fig. 410.75.01.00 - 1 piece All three frames are made of EW grade S355J2G3 material, material provided by the contractor. Frames 1 and 2 are only shot-blasted to SA 2.5, frame 3 is primed in RAL 7035 after shot-blasting. Frames 1 and 2 are due April 24, 2026, and 3 is due April 10, 2026. Documentation in DWG and STP formats will be provided upon interest.
The term search: 7 dni
Correspondence in: polskim
Similar offers
Shipping date: 2026-03-05
I WILL COMMISSION THE PRODUCTION OF TURNED ELEMENTS
Shipping date: 2026-03-05
I WILL COMMISSION THE CUTTING AND BENDING OF DETAILS FROM S235JR SHEET METAL.
Shipping date: 2026-03-05
I AM LOOKING FOR A MANUFACTURER OF METAL SHELTERS AND STANDS
Shipping date: 2026-03-04
I WILL COMMISSION CUTTING OF DETAILS UP TO 6 M LONG
Shipping date: 2026-03-02
I AM LOOKING FOR A CONTRACTOR TO PRESS M5 PINS INTO 2 MM GALVANIZED SHEET METAL.
Shipping date: 2026-03-02
I WILL COMMISSION THE PRODUCTION OF ELEMENTS
Shipping date: 2026-03-02
STEEL ELEMENTS - FRAMES - AS IN THE ATTACHED DRAWINGS.
Shipping date: 2026-03-02
I WILL COMMISSION THE PRODUCTION OF DETAILS
Shipping date: 2026-02-24
I WILL COMMISSION MILLING ACCORDING TO THE DRAWING
Shipping date: 2026-02-20
I AM LOOKING TO COMMISSION THE PRODUCTION OF BENT AND WELDED ELEMENTS
Shipping date: 2026-02-19
I WILL COMMISSION THE PRODUCTION OF ALUMINUM SETS
Shipping date: 2026-02-19
I WILL COMMISSION THE PRODUCTION OF ELEMENTS FROM GALVANIZED SHEET METAL
Shipping date: 2026-02-17
MANUFACTURING STEEL ELEMENTS FROM SHEET METAL
Shipping date: 2026-02-11
I AM LOOKING TO COMMISSION THE CONSTRUCTION OF A STEEL TRUSS FRAME MADE OF RECTANGULAR PROFILES.
Shipping date: 2026-02-09
I WILL COMMISSION CNC MACHINING OF STEEL ELEMENTS
Shipping date: 2026-02-06
I WILL COMMISSION CUTTING AND BENDING OF GALVANIZED SHEETS
Shipping date: 2026-02-06
I WILL COMMISSION THE PRODUCTION OF STEEL RINGS
Shipping date: 2026-02-05
I WILL BUY LASER-CUT ELEMENTS FROM SCRAP STEEL
Shipping date: 2026-02-05