Data wysylki: 2025-05-08
ROLLER TURNING
Looking for: Good day I would like an offer for turning 2 pieces of rollers from the attached drawing. Made of your material in the C35E grade. Made in accordance with the provided drawing and the cost of shipping the rollers to ZM Mestil. Made without phosphating. Drawing in the attachment: link to the file . and I will stay in touch.
The term search: 7 dni
Correspondence in: POLSKIM
Similar offers
Shipping date: 2025-07-02
I WILL COMMISSION THE PRODUCTION OF A STAMPING DIE WITH A CUTTING DIE
Shipping date: 2025-07-01
I WILL COMMISSION THE PRODUCTION OF A DETAIL
Shipping date: 2025-07-01
I WOULD LIKE TO COMMISSION THE PRODUCTION OF STAND ELEMENTS FROM SHEET METAL.
Shipping date: 2025-06-30
I WILL COMMISSION THE PRODUCTION OF GUN CABINETS
Shipping date: 2025-06-27
I WILL COMMISSION THE PRODUCTION OF AN ELEMENT
Shipping date: 2025-06-23
REQUEST FOR QUOTATION – TURNING 2 PARTS
Shipping date: 2025-06-16
I WILL COMMISSION THE PRODUCTION OF ELEMENTS ACCORDING TO THE DRAWING
Shipping date: 2025-06-10
I WILL COMMISSION THE PRODUCTION OF A DETAIL
Shipping date: 2025-06-07
FLAP LOCK, METAL ELEMENTS, METAL ELEMENTS MANUFACTURER.
Shipping date: 2025-06-06
I WILL COMMISSION THE PRODUCTION OF WARDROBE MEZZANINES
Shipping date: 2025-06-06
I WILL COMMISSION THE PRODUCTION OF BENCHES
Shipping date: 2025-06-05
I AM LOOKING TO COMMISSION THE PRODUCTION OF IRON CASTINGS.
Shipping date: 2025-06-05
I WILL COMMISSION THE PRODUCTION OF METAL CABINETS
Shipping date: 2025-06-05
I WILL COMMISSION THE PRODUCTION OF SHEET METAL WARDROBES
Shipping date: 2025-06-04
I WILL COMMISSION THE PRODUCTION OF SOCIAL LOCKERS
Shipping date: 2025-06-04
I WILL COMMISSION THE PRODUCTION OF CHAIRS
Shipping date: 2025-05-29
I WILL COMMISSION THE PRODUCTION OF PARTS
Shipping date: 2025-05-28
I WILL COMMISSION THE PRODUCTION OF JAWS FOR ROLLING THREADS FI 3.0/3.4 MM
Shipping date: 2025-05-28