Data wysylki: 2021-07-29
I WILL OUTSOURCE THE PRODUCTION OF ALUMINUM ALLOY CASTINGS
I will outsource the production of aluminum alloy castings. Please submit a quotation for the delivery of some high voltage line insulators to Romania. Drawing: https: link to the file pliki_rozne 1521_zdjecia.jpg . Part of it is used as a terminal structure, which was used in the production of polymer insulators. 1.the cast fitting must not show any leaks, bubbles, foreign body inclusions, or internal or surface defects that affect the mechanical properties or its appearance or behavior in use. show casting burrs, faulty machining or handling after casting or machining 3. dimensions without tolerance class will be made in accordance with EN 22768-1 Number of parts (initially) - 250,000 pieces evenly within 2 years. Cast part, material - AlSi11Cu2Fe according to EN-AC-46100, weight - 0.66 kg. Contact in English.
The term search: 14 dni
Correspondence in: angielski
Similar offers
Shipping date: 2025-07-02
I WILL COMMISSION THE PRODUCTION OF A STAMPING DIE WITH A CUTTING DIE
Shipping date: 2025-07-01
I WILL COMMISSION THE PRODUCTION OF A DETAIL
Shipping date: 2025-07-01
I WOULD LIKE TO COMMISSION THE PRODUCTION OF STAND ELEMENTS FROM SHEET METAL.
Shipping date: 2025-06-30
I WILL COMMISSION THE PRODUCTION OF GUN CABINETS
Shipping date: 2025-06-27
I WILL COMMISSION THE PRODUCTION OF AN ELEMENT
Shipping date: 2025-06-23
REQUEST FOR QUOTATION – TURNING 2 PARTS
Shipping date: 2025-06-16
I WILL COMMISSION THE PRODUCTION OF ELEMENTS ACCORDING TO THE DRAWING
Shipping date: 2025-06-10
I WILL COMMISSION THE PRODUCTION OF A DETAIL
Shipping date: 2025-06-07
FLAP LOCK, METAL ELEMENTS, METAL ELEMENTS MANUFACTURER.
Shipping date: 2025-06-06
I WILL COMMISSION THE PRODUCTION OF WARDROBE MEZZANINES
Shipping date: 2025-06-06
I WILL COMMISSION THE PRODUCTION OF BENCHES
Shipping date: 2025-06-05
I AM LOOKING TO COMMISSION THE PRODUCTION OF IRON CASTINGS.
Shipping date: 2025-06-05
I WILL COMMISSION THE PRODUCTION OF METAL CABINETS
Shipping date: 2025-06-05
I WILL COMMISSION THE PRODUCTION OF SHEET METAL WARDROBES
Shipping date: 2025-06-04
I WILL COMMISSION THE PRODUCTION OF SOCIAL LOCKERS
Shipping date: 2025-06-04
I WILL COMMISSION THE PRODUCTION OF CHAIRS
Shipping date: 2025-05-29
I WILL COMMISSION THE PRODUCTION OF PARTS
Shipping date: 2025-05-28