Data wysylki: 2024-07-09
I WILL ORDER THE CONSTRUCTION OF A TANK FROM A THICK-WALLED PIPE, E.G. FI 244, 600 MM LONG
I will order the construction of a tank from a thick-walled pipe, e.g. fi 244, 600 mm long. On one side there is a welded bottom and on the other side it is closed with a cover with tightening screws. After checking and testing, there will be more such tanks. Please contact me by email.
The term search: 7 dni
Correspondence in: polski
Similar offers
Shipping date: 2025-07-10
I WILL COMMISSION THE PRODUCTION OF CUBES FROM 18G2A STEEL
Shipping date: 2025-07-09
I AM LOOKING TO COMMISSION THE PRODUCTION OF STAINLESS STEEL SHOP FURNITURE
Shipping date: 2025-07-09
I WILL COMMISSION THE CONSTRUCTION OF A METAL STAND
Shipping date: 2025-07-02
I WILL COMMISSION THE PRODUCTION OF A STAMPING DIE WITH A CUTTING DIE
Shipping date: 2025-07-01
I WILL COMMISSION THE PRODUCTION OF A DETAIL
Shipping date: 2025-07-01
I WOULD LIKE TO COMMISSION THE PRODUCTION OF STAND ELEMENTS FROM SHEET METAL.
Shipping date: 2025-06-30
I WILL COMMISSION THE PRODUCTION OF GUN CABINETS
Shipping date: 2025-06-27
I WILL COMMISSION THE PRODUCTION OF AN ELEMENT
Shipping date: 2025-06-23
REQUEST FOR QUOTATION – TURNING 2 PARTS
Shipping date: 2025-06-16
I WILL COMMISSION THE PRODUCTION OF ELEMENTS ACCORDING TO THE DRAWING
Shipping date: 2025-06-10
I WILL COMMISSION THE PRODUCTION OF A DETAIL
Shipping date: 2025-06-07
FLAP LOCK, METAL ELEMENTS, METAL ELEMENTS MANUFACTURER.
Shipping date: 2025-06-06
I WILL COMMISSION THE PRODUCTION OF WARDROBE MEZZANINES
Shipping date: 2025-06-06
I WILL COMMISSION THE PRODUCTION OF BENCHES
Shipping date: 2025-06-05
I AM LOOKING TO COMMISSION THE PRODUCTION OF IRON CASTINGS.
Shipping date: 2025-06-05
I WILL COMMISSION THE PRODUCTION OF METAL CABINETS
Shipping date: 2025-06-05
I WILL COMMISSION THE PRODUCTION OF SHEET METAL WARDROBES
Shipping date: 2025-06-04