Data wysylki: 2024-06-03
I WILL ORDER HARDENING AND GRINDING
I will order hardening and grinding. We would need 50 pieces of each of the elements from the attachment. We will process the boards on a milling machine so that they can be delivered to you for hardening (surfaces marked " T" ) and finishing grinding (roughnesses 3.2 and 0.8). Drawings: link to the file .
The term search: 7 dni
Correspondence in: polski
Similar offers
Shipping date: 2025-06-30
I WILL COMMISSION THE PRODUCTION OF GUN CABINETS
Shipping date: 2025-06-27
I WILL COMMISSION THE PRODUCTION OF AN ELEMENT
Shipping date: 2025-06-23
REQUEST FOR QUOTATION – TURNING 2 PARTS
Shipping date: 2025-06-16
I WILL COMMISSION THE PRODUCTION OF ELEMENTS ACCORDING TO THE DRAWING
Shipping date: 2025-06-10
I WILL COMMISSION THE PRODUCTION OF A DETAIL
Shipping date: 2025-06-07
FLAP LOCK, METAL ELEMENTS, METAL ELEMENTS MANUFACTURER.
Shipping date: 2025-06-06
I WILL COMMISSION THE PRODUCTION OF WARDROBE MEZZANINES
Shipping date: 2025-06-06
I WILL COMMISSION THE PRODUCTION OF BENCHES
Shipping date: 2025-06-05
I AM LOOKING TO COMMISSION THE PRODUCTION OF IRON CASTINGS.
Shipping date: 2025-06-05
I WILL COMMISSION THE PRODUCTION OF METAL CABINETS
Shipping date: 2025-06-05
I WILL COMMISSION THE PRODUCTION OF SHEET METAL WARDROBES
Shipping date: 2025-06-04
I WILL COMMISSION THE PRODUCTION OF SOCIAL LOCKERS
Shipping date: 2025-06-04
I WILL COMMISSION THE PRODUCTION OF CHAIRS
Shipping date: 2025-05-29
I WILL COMMISSION THE PRODUCTION OF PARTS
Shipping date: 2025-05-28
I WILL COMMISSION THE PRODUCTION OF JAWS FOR ROLLING THREADS FI 3.0/3.4 MM
Shipping date: 2025-05-28
I WILL COMMISSION THE PRODUCTION OF STEEL ROLLERS
Shipping date: 2025-05-26
I WILL COMMISSION THE PRODUCTION OF ALUMINUM ELEMENTS
Shipping date: 2025-05-23
I WILL COMMISSION THE PRODUCTION OF ALUMINUM PRODUCTS
Shipping date: 2025-05-23