Data wysylki: 2025-12-10
I WILL COMMISSION THE PRODUCTION OF METAL CONTAINERS
Looking for: Special metal containers in a quantity of 6,000 pieces. General specifications: 1. Main materials used for the production of containers: Low-carbon refrigeration steel grades 08KP, 08PS, 08YU, 08FKP III with a surface treatment with very deep drawing. Manufacturing without deep drawing is possible by welding the bottom with subsequent sealing. 2. The material thickness is 0.5-0.7 mm. 3. Before closing the container, the surfaces of the lid adjacent to the end of the body must be evenly coated with paint. The use of branded GF-1426 enamel is permitted. 4. After rolling, the lid must fit tightly to the container body cracks and theft are prohibited. Small folds in the corners of the container are acceptable. 5. The container must be painted with GF-1426 enamel in a protective color. After painting, different colors are allowed. 6. Clogging, swelling, cracking, splitting, and peeling are prohibited on painted parts. 7. During the test, the vessel must be tightly closed at a pressure of 0.2 ATM. 8. Containers must ensure tightness. 9. Containers must be equipped with an opening key and a mechanical sewing device. Drawing: link to the file .
The term search: 7 dni
Correspondence in: polski
Similar offers
Shipping date: 2026-08-06
I WILL COMMISSION THE PRODUCTION OF ROLLERS
Shipping date: 2026-08-06
I WILL COMMISSION THE PRODUCTION OF BUCKETS FOR CONSTRUCTION MACHINES
Shipping date: 2026-08-06
I AM LOOKING TO COMMISSION THE PRODUCTION OF STAINLESS STEEL ELEMENTS
Shipping date: 2026-07-30
I WILL COMMISSION THE MACHINING OF ALUMINUM DETAILS
Shipping date: 2026-07-29
I WILL ORDER THE MANUFACTURE OF CUT/BENT ELEMENTS
Shipping date: 2026-07-23
I WILL COMMISSION THE PRODUCTION OF LASER-CUT ELEMENTS
Shipping date: 2026-07-21
WE WILL COMMISSION THE PRODUCTION OF ELEMENTS FROM STEEL PROFILES
Shipping date: 2026-07-21
CONSTRUCTION OF THE FRAME ACCORDING TO THE PROVIDED DOCUMENTATION
Shipping date: 2026-07-20
I WILL COMMISSION THE PRODUCTION OF A DETAIL
Shipping date: 2026-07-20
I WILL COMMISSION THE TURNING OF A DETAIL
Shipping date: 2026-07-16
I AM LOOKING TO HAVE A DETAIL TURNED FROM S235 STEEL.
Shipping date: 2026-07-15
I WILL COMMISSION THE PRODUCTION OF C-PROFILES FROM SHEET METAL
Shipping date: 2026-07-14
I AM LOOKING TO COMMISSION THE PRODUCTION OF MOLDS FOR RUBBER PRODUCTS
Shipping date: 2026-07-13
WE ARE LOOKING FOR SUBCONTRACTORS
Shipping date: 2026-07-13
I WILL ORDER BENT SHEET METAL ELEMENTS
Shipping date: 2026-07-13