Data wysylki: 2025-09-16
I WILL COMMISSION THE PRODUCTION OF ELEMENTS ACCORDING TO DRAWINGS
I&39 m looking to commission components manufactured according to drawings. Drawing: link to the file . The order includes: 2 plates (standard steel) 2 pins The pins should be carefully welded to one of the plates. Please powder-coat the plates yellow, but leave the pins unpainted. I can provide CAD models in 2D and 3D formats if needed. Please contact me by email – please include: WCS MOUNTING OFFER in the subject line.
The term search: 7 dni
Correspondence in: polski
Similar offers
Shipping date: 2025-09-16
I WILL COMMISSION THE PRODUCTION OF ELEMENTS ACCORDING TO DRAWINGS
Shipping date: 2025-09-16
I WILL COMMISSION THE PRODUCTION OF AN ELEMENT
Shipping date: 2025-09-16
I WILL COMMISSION THE PRODUCTION OF A BURNT AND BENT ELEMENT
Shipping date: 2025-09-16
I WILL COMMISSION THE PRODUCTION OF AN ELEMENT, BURNING AND BENDING
Shipping date: 2025-09-15
I WILL COMMISSION THE PRODUCTION OF CHAIR FRAMES
Shipping date: 2025-09-11
I AM LOOKING FOR A SUPPLIER OF TRAPEZOIDAL PROFILES
Shipping date: 2025-09-11
I WILL COMMISSION THE PRODUCTION OF DUST EXTRACTION DUCTS
Shipping date: 2025-09-10
I WILL COMMISSION THE PRODUCTION OF ROLLERS
Shipping date: 2025-09-10
I WILL COMMISSION THE PRODUCTION OF METAL CHAIRS
Shipping date: 2025-09-09
I WILL COMMISSION THE PRODUCTION OF METAL FRAMES FOR CHAIRS
Shipping date: 2025-09-09
I WILL COMMISSION THE PRODUCTION OF ELEMENTS FROM 1.4301 STEEL
Shipping date: 2025-09-08
I WILL COMMISSION THE PRODUCTION OF PARTS
Shipping date: 2025-09-08
I AM LOOKING TO COMMISSION THE PRODUCTION OF BLACK AND STAINLESS STEEL ELEMENTS.
Shipping date: 2025-09-05
I WILL COMMISSION THE PRODUCTION OF STEEL LEGS AND BASES
Shipping date: 2025-09-04
I AM LOOKING FOR A SUPPLIER OF SERVICES AND TOOLS FOR HOT CHAMBER ALUMINUM CASTING.
Shipping date: 2025-09-02
I WILL COMMISSION THE PRODUCTION OF METAL CABINETS
Shipping date: 2025-08-25
I WILL COMMISSION THE PRODUCTION OF A DETAIL
Shipping date: 2025-08-25
I WILL COMMISSION THE PRODUCTION OF AN ELEMENT
Shipping date: 2025-08-21
I WILL COMMISSION THE PRODUCTION OF A STEEL STRUCTURE
Shipping date: 2025-08-20