Data wysylki: 2025-08-25
I WILL COMMISSION THE PRODUCTION OF AN ELEMENT
I&39 m looking to commission the production of an element. Drawing: link to the file . The material should be the cheapest available structural pipe measuring 108 x 5 mm – the contractor is responsible for the material. The drawing does not include the coaxiality tolerance, which should be within 0.5 mm. Please prepare a quote for a quantity of 50 pieces and send the offer via email.
The term search: 7 dni
Correspondence in: polski
Similar offers
Shipping date: 2025-12-10
I WILL COMMISSION SHEET METAL BENDING AND CUTTING
Shipping date: 2025-12-10
I WILL COMMISSION THE PRODUCTION OF METAL CONTAINERS
Shipping date: 2025-12-09
I WILL COMMISSION THE PRODUCTION OF METAL PLATES
Shipping date: 2025-12-08
I WILL COMMISSION MILLING OF ELEMENTS
Shipping date: 2025-12-08
I WILL COMMISSION THE PRODUCTION OF AN ALUMINUM BLOCK
Shipping date: 2025-12-03
I WILL COMMISSION THE PRODUCTION OF AN ELEMENT MADE OF S235 STEEL
Shipping date: 2025-12-03
I WILL COMMISSION THE PRODUCTION OF FLOWER STANDS FROM ALUMINUM SHEET
Shipping date: 2025-11-29
I WILL COMMISSION THE PRODUCTION OF BRASS PLATES
Shipping date: 2025-11-28
I AM LOOKING FOR A HALL SUPPLIER
Shipping date: 2025-11-24
I WILL COMMISSION THE PRODUCTION OF AN ELEMENT
Shipping date: 2025-11-19
I WILL COMMISSION THE PRODUCTION OF CONNECTOR ELEMENTS
Shipping date: 2025-11-18
I WILL COMMISSION CUTTING AND BENDING OF SHEET METAL DETAILS
Shipping date: 2025-11-17
I WILL COMMISSION THE PRODUCTION OF ELEMENTS
Shipping date: 2025-11-17
I WOULD LIKE TO ORDER THE PRODUCTION OF A FLAP SUPPORT MADE OF STAINLESS STEEL SHEET
Shipping date: 2025-11-17
I AM LOOKING TO COMMISSION A STAINLESS STEEL STRUCTURE
Shipping date: 2025-11-10
WE WILL COMMISSION THE MACHINING OF A STEEL DETAIL
Shipping date: 2025-11-07
I WILL COMMISSION THE PRODUCTION OF PLATES FROM STEEL SHEET
Shipping date: 2025-11-06
I WILL ORDER BENDING OF WIRE ELEMENTS
Shipping date: 2025-11-03





