Data wysylki: 2025-01-10
I WILL COMMISSION THE CONSTRUCTION OF A STEEL HALL
Looking for a contractor for a steel hall covered with a sandwich panel: Parameters: Dimensions: 10x25 m, Wall height: 5 m, Number of gates: 2 pcs. Gate dimensions: 4.5x4.5 m + 3x3 m Number of doors: 2 pcs. Skylight: in the ridge, 12 m, Thickness of wall plate: 100 mm, color from the outside 7016/9005 inside Thickness of roof plate: 120 mm, color from the outside 7016/9005 inside Guttering and processing: Included in the price, Construction design: Included in the price, The price should include all costs related to the construction, i.e. equipment necessary for assembly, etc. Place of assembly: near Gorzów Wielkopolski, Work commencement date: March/April
The term search: 7 dni
Correspondence in: polski
Similar offers
Shipping date: 2025-07-02
I WILL COMMISSION THE PRODUCTION OF A STAMPING DIE WITH A CUTTING DIE
Shipping date: 2025-07-01
I WILL COMMISSION THE PRODUCTION OF A DETAIL
Shipping date: 2025-07-01
I WOULD LIKE TO COMMISSION THE PRODUCTION OF STAND ELEMENTS FROM SHEET METAL.
Shipping date: 2025-06-30
I WILL COMMISSION THE PRODUCTION OF GUN CABINETS
Shipping date: 2025-06-27
I WILL COMMISSION THE PRODUCTION OF AN ELEMENT
Shipping date: 2025-06-23
REQUEST FOR QUOTATION – TURNING 2 PARTS
Shipping date: 2025-06-16
I WILL COMMISSION THE PRODUCTION OF ELEMENTS ACCORDING TO THE DRAWING
Shipping date: 2025-06-10
I WILL COMMISSION THE PRODUCTION OF A DETAIL
Shipping date: 2025-06-07
FLAP LOCK, METAL ELEMENTS, METAL ELEMENTS MANUFACTURER.
Shipping date: 2025-06-06
I WILL COMMISSION THE PRODUCTION OF WARDROBE MEZZANINES
Shipping date: 2025-06-06
I WILL COMMISSION THE PRODUCTION OF BENCHES
Shipping date: 2025-06-05
I AM LOOKING TO COMMISSION THE PRODUCTION OF IRON CASTINGS.
Shipping date: 2025-06-05
I WILL COMMISSION THE PRODUCTION OF METAL CABINETS
Shipping date: 2025-06-05
I WILL COMMISSION THE PRODUCTION OF SHEET METAL WARDROBES
Shipping date: 2025-06-04
I WILL COMMISSION THE PRODUCTION OF SOCIAL LOCKERS
Shipping date: 2025-06-04
I WILL COMMISSION THE PRODUCTION OF CHAIRS
Shipping date: 2025-05-29
I WILL COMMISSION THE PRODUCTION OF PARTS
Shipping date: 2025-05-28