Data wysylki: 2026-01-07
I WILL COMMISSION GRINDING OF STAINLESS STEEL PIPES
I am looking for stainless steel pipe grinding services as per the drawing: Drawing: link to the file . Material: 1.4301. Allowances to be agreed with the contractor. 3 runs at 1-month intervals of 20 pieces each.
The term search: 7 dni
Correspondence in: polski
Similar offers
Shipping date: 2026-03-02
I AM LOOKING FOR A CONTRACTOR TO PRESS M5 PINS INTO 2 MM GALVANIZED SHEET METAL.
Shipping date: 2026-03-02
I WILL COMMISSION THE PRODUCTION OF ELEMENTS
Shipping date: 2026-03-02
STEEL ELEMENTS - FRAMES - AS IN THE ATTACHED DRAWINGS.
Shipping date: 2026-03-02
I WILL COMMISSION THE PRODUCTION OF DETAILS
Shipping date: 2026-02-24
I WILL COMMISSION MILLING ACCORDING TO THE DRAWING
Shipping date: 2026-02-20
I AM LOOKING TO COMMISSION THE PRODUCTION OF BENT AND WELDED ELEMENTS
Shipping date: 2026-02-19
I WILL COMMISSION THE PRODUCTION OF ALUMINUM SETS
Shipping date: 2026-02-19
I WILL COMMISSION THE PRODUCTION OF ELEMENTS FROM GALVANIZED SHEET METAL
Shipping date: 2026-02-17
MANUFACTURING STEEL ELEMENTS FROM SHEET METAL
Shipping date: 2026-02-11
I AM LOOKING TO COMMISSION THE CONSTRUCTION OF A STEEL TRUSS FRAME MADE OF RECTANGULAR PROFILES.
Shipping date: 2026-02-09
I WILL COMMISSION CNC MACHINING OF STEEL ELEMENTS
Shipping date: 2026-02-06
I WILL COMMISSION CUTTING AND BENDING OF GALVANIZED SHEETS
Shipping date: 2026-02-06
I WILL COMMISSION THE PRODUCTION OF STEEL RINGS
Shipping date: 2026-02-05
I WILL BUY LASER-CUT ELEMENTS FROM SCRAP STEEL
Shipping date: 2026-02-05
I AM LOOKING TO COMMISSION THE PRODUCTION OF STAINLESS STEEL CHAIR FRAMES.
Shipping date: 2026-01-31
I WILL COMMISSION CUTTING OF STEEL PROFILES
Shipping date: 2026-01-30
I WILL COMMISSION THE PRODUCTION OF STEEL DETAILS
Shipping date: 2026-01-29
I AM LOOKING TO COMMISSION THE PRODUCTION OF STAINLESS STEEL CHAIR FRAMES.
Shipping date: 2026-01-28