Data wysylki: 2025-09-29
I AM LOOKING TO COMMISSION THE PRODUCTION OF AN ELEMENT FROM S355 ROLLED ROD.
I am looking to commission the production of an element from S355 rolled bar. According to the drawing: link to the file . Material to be provided by the contractor. S355 rolled bar. The missing shank diameter over a length of 70 mm is 13.8 mm. Please quote for 1000 pcs.
The term search: 7 dni
Correspondence in: polski
Similar offers
Shipping date: 2025-09-30
I WILL COMMISSION THE PRODUCTION OF BLACK OR CORTEN STEEL FLOWERPOTS.
Shipping date: 2025-09-29
I AM LOOKING TO COMMISSION THE PRODUCTION OF AN ELEMENT FROM S355 ROLLED ROD.
Shipping date: 2025-09-25
I WILL COMMISSION THE PRODUCTION OF ELEMENTS FROM 16MNCR5 STEEL
Shipping date: 2025-09-23
I AM LOOKING FOR A CONTRACTOR FOR OUTDOOR GAZEBOS AND STRUCTURES
Shipping date: 2025-09-22
I AM LOOKING FOR SUPPLIERS OF METAL PRODUCTS AND METALWORK.
Shipping date: 2025-09-16
I WILL COMMISSION THE PRODUCTION OF ELEMENTS ACCORDING TO DRAWINGS
Shipping date: 2025-09-16
I WILL COMMISSION THE PRODUCTION OF AN ELEMENT
Shipping date: 2025-09-16
I WILL COMMISSION THE PRODUCTION OF A BURNT AND BENT ELEMENT
Shipping date: 2025-09-16
I WILL COMMISSION THE PRODUCTION OF AN ELEMENT, BURNING AND BENDING
Shipping date: 2025-09-15
I WILL COMMISSION THE PRODUCTION OF CHAIR FRAMES
Shipping date: 2025-09-11
I AM LOOKING FOR A SUPPLIER OF TRAPEZOIDAL PROFILES
Shipping date: 2025-09-11
I WILL COMMISSION THE PRODUCTION OF DUST EXTRACTION DUCTS
Shipping date: 2025-09-10
I WILL COMMISSION THE PRODUCTION OF ROLLERS
Shipping date: 2025-09-10
I WILL COMMISSION THE PRODUCTION OF METAL CHAIRS
Shipping date: 2025-09-09
I WILL COMMISSION THE PRODUCTION OF METAL FRAMES FOR CHAIRS
Shipping date: 2025-09-09
I WILL COMMISSION THE PRODUCTION OF ELEMENTS FROM 1.4301 STEEL
Shipping date: 2025-09-08
I WILL COMMISSION THE PRODUCTION OF PARTS
Shipping date: 2025-09-08
I AM LOOKING TO COMMISSION THE PRODUCTION OF BLACK AND STAINLESS STEEL ELEMENTS.
Shipping date: 2025-09-05
I WILL COMMISSION THE PRODUCTION OF STEEL LEGS AND BASES
Shipping date: 2025-09-04