Data wysylki: 2024-05-10
I WILL ORDER THE PRODUCTION OF COVERS
Looking for: I am asking for a price and time offer for the production of boards according to the attached drawing. Material on the contractor' s side S235JRG2 DIN ISO 10029. Drawing: link to the file There will be 2,820 pieces to be made.
The term search: 7 dni
Correspondence in: polskim